Figure 38: Connecting The Twisted Pair Cable Into The Net Mgmt Port - Allied Telesis AT-DC2552XS Installation Manual

L2 data center switch
Hide thumbs Also See for AT-DC2552XS:
Table of Contents

Advertisement

Stack Installation Guide for AT-2552XS L2 Data Center Switch
Figure 38. Connecting the Twisted Pair Cable into the NET MGMT port
3. With the AT-DC2552XS and link partner network device powered on,
verify that the NET MGMT port LINK/ACT LED is either amber or
green. See "NET MGMT LED Descriptions" on page 26 for the
functional description of this LED. See Chapter 7, "Troubleshooting" on
page 75 if this LED does not illuminate.