If you ordered a monitor from Intergraph Computer Systems, it is shipped separately from
the base unit pallet. Its carton contains the monitor, the monitor AC power cord, the video
cable, and monitor documentation.
NOTE
If any of the listed items were not delivered, call the Customer Response Center immediately
at 1-800-633-7248.
Save all packaging materials after setting up the system. If you return equipment for repair,
it must be in its original packaging for you to get warranty service (if provided under your
contract agreement).

Placing the System

Before you set up your system, determine where you want to place it. Keep these guidelines
in mind:
u
Place the system as close as possible to the proper power outlet. The power cord
connecting the system to the facility power outlet or other power source serves as the
disconnect device.
u
Place the system in an area where air can circulate freely around it.
u
For a deskside installation, the front of the system requires at least twelve inches
clearance, and the back of the system requires at least eight inches clearance.
For rack mounting, ensure that the front and the back of the rack each have 36 inches of
clearance for servicing the installed hardware.
u
Do not expose the system to high levels of dust, smoke, or moisture.
u
Place the system in an area where the temperature range stays between 10 C and 26 C
(50 F and 80 F). The optimum operating temperature is 21 C (70 F).
u
Place the system in an area where the humidity stays between 20 percent and 80 percent
(non-condensing). The optimum operating humidity is 50 percent (non-condensing).
Install the system as described in "Setting up a Deskside System" or "Installing a System
into a Rack."