Installing The Motor Assembly; Installing The Water Pump - RIDGID WTS2000L Operator's Manual

10 inch wet tile/stone saw with laser guide, led work light, and stand
Table of Contents

Advertisement

ASSEMBLY

Installing the Motor Assembly

Position the motor assembly onto the frame assembly. Using
the hex wrench supplied, first install and tighten the four
bolts, then place the four bolt covers on the bolts (Fig. 11).

Installing the Water Pump

1. Connect the end of the water hose to the water outlet
on the water pump.
. Locate the water-pump-positioning tabs in the water
tray. With the water tray in place beneath the saw, posi-
tion the water pump as shown in Fig. 1. Press the wa-
ter pump in place to secure it to the water tray with the
attached suction cups.
3. Connect the water-pump power cord to the receptacle
on the saw, as shown in Fig. 13.
15
4 Bolts and
Bolt Covers
Fig. 11
Fig. 1
Fig. 13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents