Kit Contents; Installing The Stack Bracket Kit; Installation Preparation; Install Rubber Pads To Dryer Base - GE Profile DPVH890 Owner's Manual & Installation Instructions

Table of Contents

Advertisement

Available languages

Available languages

Installation
Instructions
KIT CONTENTS
i
[] Right hand bracket
[] Left hand bracket
[] 4 rubber pads
[] 4 #12 x 1" screws
[] 4 #8 x 1/2" screws
TOOLS YOU WILL NEED
[] Phillips screwdriver
[] Open-endedwrench
[] Gloves
[] Level
[] Pliers
INSTALLATION
PREPARATION
Remove the packaging.
Flatten the product carton to use as a pad to lay
the dryer down on its side. Continue using the
carton to protect the finished floor in front of
the installation
location.
INSTALLING THE STACK
BRACKET KIT
I_ REMOVE THE DRYER LEVELING LEGS
A. Carefully lay the dryer on its side. Use the
packing material so you don't scratch the finish
on the dryer.
B. Use an open-end wrench or pliers to remove
the dryer leveling legs.
Backout andremove
all 4 levelinglegs
I
[_] INSTALL RUBBER
PADS
TO DRYER BASE
Locate the 4 rubber pads in the parts package.
Remove the adhesive backing and firmly place
over on the bracket where you removed the
leveling legs.
39

Advertisement

Table of Contents
loading

This manual is also suitable for:

Profile upvh890

Table of Contents