Central Site Configuration; Ppp Link Status - Patton electronics IPLink 2603 Getting Started Manual

Iplink series high speed routers
Hide thumbs Also See for IPLink 2603:
Table of Contents

Advertisement

Models 2603, 2621, and 2635 Getting Started Guide
Central Site Configuration. If the router at the ISP or Central site is another IPLink series, follow the instruc-
tions below. If not, consult your third party router user manual for configuration.
See the web pages for the desktop above. Some configurable parameters are different although the process is the
same.
Configure the IP address of the Ethernet port (interface ip1) to be 192.168.172.3/24. The PC, connected to
the Ethernet LAN directly, must be on the same subnet in order to access the configuration web pages. In this
example, the PC's IP address is 192.168.172.229/24. Notice that this subnet differs from the subnets of the
WAN service link and also the Ethernet port of the remote IPLink (which we just configured).
1. Bring up the web-page management system on your browser by entering the IP address of the IPlink,
192.168.172.3.
2. On the Menu, go to Service Configuration, then to WAN. Delete the default WAN services already defined.
3. Click on Create a new service in the main window, select "PPP routed" and click on the
In the Description field, enter the description. In this example, it is called PPP Routed.
Description: PPP Routed
Interface: 1
WAN IP address and Mask: 192.168.164.3 255.255.255.255
LLC Header Mode: off
HDLC Header Mode: ON
No authentication
WAN Service Configuration
Figure 33. PPP link status
6 • WAN Services
button.
Continue
57

Advertisement

Table of Contents
loading

This manual is also suitable for:

Iplink 2621Iplink 2635

Table of Contents