Preparations For Hdlm Uninstallation - Hitachi XP P9500 User Manual

Command suite for vmware(r)
Hide thumbs Also See for XP P9500:
Table of Contents

Advertisement

The value you specify here will apply to n in program-installation-
destination-drive:\Program Files\HITACHI\HNTRLib2\spool
\Hntr2n.log (n indicates a file number).
3
In File Size(KB), change the size of an integrated trace file.
.
The default is 256 (kilobytes). You can specify a value from 8 to 8192.
Specify a value greater than or equal to the setting of Buffer Size(KB).
4
In Buffer Size(KB), change the buffer size.
.
Change the buffer size for the monitoring cycle.
The default is 64 (kilobytes). You can specify a value from 8 to 2048.
Specify a value smaller than or equal to the setting of File Size(KB).
5
In Interval Timer(Sec), enter a value to shorten the monitoring cycle.
.
The default is 10 (seconds). You can specify a value from 1 to 300.
6
In Lookout Span(Sec), enter a value to specify the interval for
.
monitoring the number of messages to be output to the integrated trace
file.
The default is 0 (seconds). You can specify a value from 0 to 3600.
If you specify 0, you cannot adjust the number of messages to be output
because the system ignores the setting of Max Messages / Span.
7
In Max Messages / Span, enter a value to specify the maximum
.
number of messages to be output to the integrated trace file at the
monitoring interval specified in Lookout Span(Sec).
The default is 0. You can specify a value from 0 to 500.
If you specify 0, you cannot adjust the number of messages to be output.
If you specify 0 for Lookout Span(Sec), you cannot adjust the number
of messages to be output because the system ignores the Max
Messages / Span setting.
8
After you finish changing the settings, click the OK button.
.
The dialog box closes.
9
Terminate every Hitachi program product that uses the Hitachi Network
.
Objectplaza Trace Library, or restart the remote management client.
Uninstalling HDLM
This section explains how to return the operating environment to the way it
was before HDLM was installed.

Preparations for HDLM Uninstallation

Back up all the data on the host where HDLM is installed. Also, if
necessary, back up the data on the management target device.
Shut down any application processes and services, such as DBMS, that
use a path managed by HDLM.
Creating an HDLM Environment
Hitachi Dynamic Link Manager User Guide (for VMware(R))
3-15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dynamic link manager

Table of Contents