Fujitsu Siemens Computers PRIMERGY B120 Operating Manual page 32

Intel-based server systems
Table of Contents

Advertisement

Preparation for use and operation
Enabling access to the hard disk drives
Ê
Unlock the server (1).
Ê
Slide up the drive cover as far as possible (2).
Ê
Remove the hard disk cover toward the front (3 + 4).
The hard disk cover is remounted and the server connected in the reverse order.
24
2
4
3
Unlocking/locking the tower server
1
A26361-K646-Z102-1-7619

Advertisement

Table of Contents
loading

Table of Contents