Connection To Power Source; Preparation Of Machine For Operation - Brother BES-1216AC Instruction Manual

Electronic
Hide thumbs Also See for BES-1216AC:
Table of Contents

Advertisement

Chapter 1 Preparation of Embroidery Machine

4-4 Connection to Power Source

Be sure to connect an earth cable.
Failure to do so may result in electric shock.
Use a cord plug that matches the receptacle type.

4-5 Preparation of Machine for Operation

Check the following before turning on the power
Thread
(1) Are upper thread settings complete?
(3) Are threads passed through needles?
Embroidery hoop
(1) Is there any looseness in the material?
Needle stop position
(1) Are thread take-ups aligned horizontally?
(This figure shows model BES-916AC.)
28
q
BES-916AC • BES-1216AC
DANGER
(2) Are threads passed smoothly?
(4) Are lower thread settings complete?
(2) Is the hoop clamped securely?
(2) Are needle bars positioned at the top?
Note) If thread take-up q, which is not in the drive
position, is out of alignment, raise it by hand.
The stopper works to align thread take-up q
with the others.
Turning on the power switch brings up the
message "Moving frame" and sounds a
beep as a warning. Then, the X and Y
carriages move the embroidery hoop to the
home position or the position where it was
located at the end of the previous
operation. Check that there is no obstacle
above the hoop which will interfere with
needles or presser feet.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bes-916ac

Table of Contents