JVC LX-D1010G - Lcd Projector Service Manual page 60

Lcd data projector
Table of Contents

Advertisement

LX-D1010G
Lead dress when attaching each part
Cushion
Stick the cushion pulling the
wire toward the left to take in
slack in the wires.
Put the wire into the
gap to take in slack.
Cushion
The NN-GN lead wire
should cross the SA-CB2
lead wire.
Run this earth wire above
the SY and SV lead wires.
Run the GN lead wire
under the SY lead wire.
13-2 (PA012)
to SN
to SF
Lead holder
SD
SF
SBX
SGX
SRX
SY
SV
Cushion
to Power Ass'y
Put the thick lead wire from the
lamp power into the gap so that it
never sticks out of the barrier. Do
to SZ
not run this lead wire into the Power
Ass'y in order to secure an air duct.
SZ SW
SN
ST
SX
SL
Cushion
Yellow-Green lead
Do not position the wires
higher than the Main PWB.
Put the wire into the
gap to take in slack.
The wire put into the
gap should not interfere
the lighting part and the
screw.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents