Figure 28 Battery cabinet interconnection

NOTES:
1. All cables must be repositioned prior to and while setting the cabinets in their installed location.
2. Refer to the individual drawing of each piece of equipment for additional details.
Run
From
A
UPS Battery Terminal Block
B
External Battery Cabinet
Battery Cabinet(s) Breaker
C
Control Terminal Block
D
UPS Ground
To
First External Battery Cabinet
Additional External
Battery Cabinet(s)
UPS Monitoring Board
Battery Cabinets Ground
43
Installation Drawings
Conductors
Positive, Negative
Positive, Negative
Battery Breaker
Auxiliary Contacts
Ground