Figure 4.10 Power On/Off Sequence (2); Figure 4.11 Power On/Off Sequence (3) - Fujitsu MBA3073NC - Enterprise 73.5 GB Hard Drive Product Manual

Product manual
Hide thumbs Also See for MBA3073NC - Enterprise 73.5 GB Hard Drive:
Table of Contents

Advertisement

56
Downloaded from
www.Manualslib.com
c) In a system which does not use the terminating resistor power supply signal (TERMPWR) on
the SCSI bus, the requirements for +5 VDC given in Figure 4.10 must be satisfied between the
HDD and the SCSI device with the terminating resistor circuit.
SCSI devices with
the terminating
resistor

Figure 4.10 Power on/off sequence (2)

d) Between the HDD and other SCSI devices on the SCSI bus, the +5 VDC power on/off
sequence is as follows:
In a system with its all SCSI devices designed to prevent noise from leaking to the SCSI
bus when power is turned on or off, the power sequence does not matter if the
requirement in b) or c) is satisfied.
In a system containing an SCSI device which is not designed to prevent noise from
leaking to the SCSI bus, the requirement given in Figure 4.11 must be satisfied between
that SCSI device and the HDD.
SCSI devices
without noise
leaking designed

Figure 4.11 Power on/off sequence (3)

manuals search engine
C141-E270

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mba3300ncMba3147ncMba3147npMba3073npMba3300 np series

Table of Contents