Exchange The Control Unit; Maintenance - Duerkopp Adler 510 Operating/Service Instructions Manual

Cnc automat for bartacking seams and short seams
Hide thumbs Also See for 510:
Table of Contents

Advertisement

8.

Exchange the control unit

9.

Maintenance

Maintenance work to be carried out
Bartacker head
- Remove sewing dust and thread tails
- Check oil level in the oil reservoirs for the lubrication of the sewing
machine head
Control circuitry cabinet
- Remove sewing dust and thread tails
- Clean fan grill
42
See:
Part 2, Installing instruction: "Sewing software installation".
Caution: Danger of injury !
Switch off main switch.
Maintenance work of the automatic bartacker must only be
carried out when the machine is switched off.
The daily or weekly maintenance work (cleaning and oiling) to be
carried out by the operators of the automatic bartacker are described
in the operating instructions (chapter 10). They are only listed in the
following table to complete the picture.
Operating hours
8
40
160
500
X
X
X
X

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents