Cabling and Powering Up the System

Management Modules

The server blade management modules and power management modules are cabled
together in daisy-chain fashion to provide the management link. Each management
module has two management link connectors: one to connect to enclosures above and
one to connect to enclosures below. Cabling the management modules enables the
system to identify rack topology for power and data management.
CAUTION: Do not install NIC cabling or telephone cabling into the management link
connectors; these devices are not supported.
Management Cabling Guidelines
Observe the following guidelines for cabling the management modules.
On the server blade management module:
The upper management link connector connects to enclosures above the module.
The lower management link connector connects to enclosures below the module.
On the power management module:
The right management link connector connects to enclosures above the module.
The left management link connector connects to enclosures below the module.
Additional Guidelines for 42U Solution
Observe the following additional guidelines for configuring a full-rack 42U solution
with two pairs of mini bus bars:
You must set the power configuration switches to establish the two power zones.
Refer to the "Power Configuration Switches" section in Appendix D, "LEDs and
Switches."
You must cable the power management module in zone 2 (upper pair of mini bus
bars) to both adjacent server blade management modules, above and below. This
connection enables system management to establish a full-rack topology.
4-14