10. Repeat steps 1 through 9 for the left rack rail.
IMPORTANT: To ease installation, install all cage nuts for enclosures, bus bar hinges,
and cable brackets at this time.
11. Using the marks you made when measuring with the template, install the cage
nuts for enclosures, bus bar hinges, and the cable bracket.
IMPORTANT: In AC power configurations, the bottom hinges for each bus bar are
installed into cage nuts and the ends of power enclosure rack rails. In these locations, the
rails have extrusions to align the hinges and holes to accept screws. In facility DC power
configurations, you must install cage nuts to support the bottom hinges. Refer to the
template for hinge locations.
Figure 3-4: Installing Cage Nuts
HP ProLiant BL p-Class System Setup and Installation Guide
CAUTION: Rack rails must be installed as tightly as possible. Failure to obtain a
proper fit may result in damage to equipment.
Installing System Hardware
3-5