HP BL20p - ProLiant - G2 Setup And Installation Manual page 70

Hp proliant bl p-class system setup and installation guide
Hide thumbs Also See for BL20p - ProLiant - G2:
Table of Contents

Advertisement

5. Connect the network cables to the appropriate interconnects and their respective
modules. For connector locations, refer to the documentation that ships with the
interconnect option kit or to the server blade setup and installation guide.
6. Gather the network cables for the left and right sides of the rack.
7. Insert the ends of the cable retaining brackets into the cable bracket (1).
8. Tighten the thumbscrews to secure the cable retaining brackets over the
cables (2).
Figure 4-18: Installing the cable retaining brackets
HP ProLiant BL p-Class System Setup and Installation Guide
Cabling and Powering Up the System
4-25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant bl p-class

Table of Contents