Installation
Installing the Server in a Rack
Install the Slider Assembly
The following steps describe how to install the slide-tray assembly into an approved HP equipment
enclosure. The slide-tray assembly can be installed into an HP E-Series enclosure and some other approved
HP enclosures.
NOTE
If compliance with Belcore GR63 CORE earthquake standards is required, the enclosure
used should be NEBS compliant.
Perform this procedure to preparation for field integration of a slide-tray mountable server in an approved
enclosure. To prepare an equipment enclosure for field integration of a server proceed as follows:
Step 1.
Determine whether or not the enclosure into which you will install the slide/tray kit is a E-Series
or an approved non-E-Series enclosure.
The non-E-Series enclosure has full return flanges on the vertical mounting rails where the
E-Series enclosure has only partial return flanges on the vertical mounting rails.
Su p p o r t No tc h es
fo r Rails
Fro nt (Rear )
o f Cab in et
Ever y Fifth R ail
Ho le No t c h ed
E I A S paced
M ount i ng H ol es
Non E-series Cabinet
Step 2.
Determine into which vertical, rectangular, slots in the return flanges that the slide/tray kit will
be installed. To correctly position the slide tray assembly, count down eight rectangular slots
from the top of the enclosure or from the bottom of the equipment installed above.
12
15.875
U=44.45
15.875
12.7
15.875
U=44.45
15.875
12.7
Measurements
in mm.
2U Envelope
Threaded inserts
E-Series Cabinet
One
EIA unit
or "U"
Chapter 1