Installation Tasks - HP L1000 - 9000 - 0 MB RAM Manual

Carrier grade addendum - rp5400 series of servers
Hide thumbs Also See for L1000 - 9000 - 0 MB RAM:
Table of Contents

Advertisement

Installation Tasks

Step 1.
Prepare the Site
Refer to the rp5400 Series of Servers Site Preparation information for general information on site
preparation.
Information on AC power requirements listed in the rp5400 Series of Servers Site Preparation
information does not apply to this product.
For NEBS compliance, the server must be installed in a NEBS certified rack.
NOTE
Step 2.
Receive and Unpack the Server
Refer to the rp5400 Series of Servers Unpack and Install Instructions.
Step 3.
Install the Server in a Standalone enclosure
See "Installing the Server in a Rack."
Step 4.
Install Internal Server Components
Refer to the rp5400 Series of Servers Unpack and Install Instructions and Installing Add-On
Components documents for installation instructions for internal server components.
NOTE
Some internal components are too delicate to be installed in the server prior to shipping.
These internal components are shipped with the server, but are packed separately. They can
be installed after the enclosure has been unpacked and positioned.
Some of the internal components that are packed separately are not user-installable. To
maintain warranty validation, these items must be installed by a Hewlett-Packard Customer
Engineer. If you received Central Processing Units (CPUs), contact your Hewlett-Packard
provider to arrange for installation.
Chapter 1
Installation
Installation Tasks
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rp5400 series

Table of Contents