Installing the hot-swap power supply cage
This procedure applies only to server models that have hot-swap power-supplies.
To install the hot-swap power supply cage, complete the following steps:
1. Place the power-supply cage into the chassis and slide it toward the rear of the
2. Install the four screws that secure the power-supply cage to the chassis.
3. Connect the cables from the power-supply cage to the system board and all
4. Reinstall both hot-swap power supplies (see "Installing a hot-swap power
5. Install the side cover (see "Installing the side cover" on page 53).
6. Lock the side cover if you unlocked it during removal.
7. Reconnect the external cables and power cords; then, turn on the attached
server until the retaining clips engage the top of the chassis.
internal components.
supply" on page 74).
devices and turn on the server.
Chapter 4. Removing and replacing server components
95
Need help?
Do you have a question about the 436854u - System x3200 M2 5U Mini Tower Server and is the answer not in the manual?
Questions and answers