Toshiba A100 VA3 - Satellite - Pentium Dual Core 1.6 GHz Maintenance Manual page 261

Maintenance manual
Hide thumbs Also See for A100 VA3 - Satellite - Pentium Dual Core 1.6 GHz:
Table of Contents

Advertisement

4 Replacement Procedures
5) Assembly of Board ASSY (Gate PCB fixing with Double Tape.)
Caution: Pressure or stress should not be given on PCB and TCP.
Figure 4-60 Replacing LG Phillip fluorescent lamp (5)
6. Assembly of Source PCB and Gate PCB
<Procedure>
1) Assembly of Source PCB
Caution: Stress should not be given on TCP.
4-74
4.25 Fluorescent lamp
PORTEGE A100 Maintenance Manual (960-460)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Portege a100

Table of Contents