Battery Board/Heat Sink/Cpu - Toshiba A100 VA3 - Satellite - Pentium Dual Core 1.6 GHz Maintenance Manual

Maintenance manual
Hide thumbs Also See for A100 VA3 - Satellite - Pentium Dual Core 1.6 GHz:
Table of Contents

Advertisement

4.19 2nd Battery board/Heat sink/CPU
nd
4.19 2

Battery board/Heat sink/CPU

nd
4.19.1 2
Battery board
nd
Removing the 2
battery board
nd
To remove the 2
battery board, perform the following procedure. (See Figure 4-27.)
1. Remove the following screws fixing the 2
nd
of the 2
battery board from the connector PJ9501 on the system board then remove
nd
the 2
battery board.
Holder
Figure 4-27 Removing the 2nd battery board/heat sink
nd
Installing a 2
battery board
nd
To install a 2
battery board, perform the following procedure. (See Figure 4-27.)
1. Insert the connector of the 2
board and fix the 2
PORTEGE A100 Maintenance Manual (960-460)
M2.5 4B
FLAT BIND screw
nd
battery board into the connector PJ9501 on the system
nd
battery board with the following screws.
M2.5 4B
FLAT BIND screw
4 Replacement Procedures
nd
battery board and remove the connector
x2
M2 x 4Z BIND
M2.5 x 4B FLAT BIND
PJ9501
2
battery board
n d
Heat sink
x2
4-37

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Portege a100

Table of Contents