Power-On of the Device

Checklist Before Device Power-On
Before powering on the device, check that:
The power cord and ground cable are correctly connected.
The voltage of the power source conforms to voltage requirement of the device.
The console cable is correctly connected, the configuration terminal or PC is powered on, and the
emulation program is properly configured.
If an external CF card is needed to store applications, the CF card is properly installed.

Powering On the Device

Step1 Turn on the power source.
Step2 Turn on the power switch on the device.
Checklist/Operations After Power-On
After powering on the device, check that:
1)
The LEDs on the front panel are normal.
The following table describes normal LED states after the device is powered on.
5-4

Advertisement

Chapters

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SECPATH U200-CS and is the answer not in the manual?

Questions and answers

Table of Contents