FUTABA 9 CHP SUPER Instruction Manual page 92

9 channel radio control system
Hide thumbs Also See for 9 CHP SUPER:
Table of Contents

Advertisement

DELAY: The Delay function provides a smooth transition between the trim positions whenever OFFSET, REVO. MIXING, or
THROTTLE HOLD functions are turned on and off.
Adjustability:
• Separate delay times are available for aileron, elevator, rudder, throttle, and pitch.
• With a 50% delay setting, the servo takes about a half-second to move to its new position...quite a long time.
• In general, delays of approximately 10-15% are sufficient.
GOAL of EXAMPLE:
Set up a delay on all 3 channels to ease
the transition from one flight condition
to another so there are no "hard jumps."
Where next?
STEPS:
Open the DELAY function.
Adjust AIL response as needed. (Ex:
aileron to +8%.)
Repeat for other channels.
Close menus and confirm slowed
transitions.
THR-HOLD: see p. 88.
Setting up the Idle-Ups: Throttle and Collective pitch Curves and Revo. Mixing
(TH-CURVE, PIT-CURVE, REVO. MIXING for idle-ups: see p. 90.
92
INPUTS:
for 1 second.
(If basic,
to DELAY.
to +8%.
to ELE. Repeat step above.
E (9CH) or G (9CA) from
NORMAL to IDL2. Check that servos
move gradually to new positions.
again.)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9cp super9caf super9cap super9chf super

Table of Contents