Assembly And Set Up; Installing Belt; Installing Pulley Cover - Baileigh Industrial IJ-883P-HH Operator's Manual

8” - helical head long bed jointer
Table of Contents

Advertisement

ASSEMBLY AND SET UP

WARNING:
power source until the machine is completely assembled and you read and
understand the entire instruction manual.
Locate the jointer in an area that is level and provides a solid foundation. Make sure that any
potential kickback is not in line with aisles, doorways, wash stations or other work areas.
Place shims under the four feet mounted in the base as required for leveling.

Installing Belt

1. To attach the belt to the cutterhead pulley and motor pulley, first
reach into the dust chute with a wrench and loosen the four bolts
holding the motor to the mount bracket.
2. Align the pulleys using the slotted holes on the mounting bracket.
3. Raise the motor and mount the belt to both pulleys.
4. Allow the motor to drop and create tension on the belt.
5. Pull down on the motor to achieve the desired belt tension of
approximately 1" (25mm) at the center belt span using light finger
pressure.
6. Snug tight the four bolts

Installing Pulley Cover

The pulley cover is mounted with knob to the threaded
holes in the base.
For your own safety, DO NOT connect the machine to the
14
14

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IJ-883P-HH and is the answer not in the manual?

Table of Contents