Download Print this page

Installation - E.C.A. CALORA PREMIX Installation And User's Operating Instructions

Condensing boiler

Advertisement

8. INSTALLATION

8.1. Selection of Installation Location of Device
The boiler must be installed in accordance with gas safety regulations and relevant standards. Additionally, the
clearance around the boiler should be as shown in fig 4. In order to make service, maintenance and usage
easier.
Figure 9: It shows the minimum distances required from the top and sides of the device (Dimensions given in
mm).
The installation must comply with the following minimum distances so that servicing and maintenance of the boiler
can be performed correctly. The position of the boiler must be checked against technical requirements.
• The device can be used at altitudes up to 2000 m above sea level.
Information
• There is no need to remove side panels in the combi boiler service operations.
Minimum 50 mm clearances are given taking into consideration the share of possible
Information
side panel sheet changes.
• Do not install your boilers in locations that will be exposed to direct sunlight. Sunlight
can cause color change on the exterior of your device over time. Ambient
Information
temperature of device's installation location should be between 5-35
- Since the outside temperature of the device does not rise above 85 ° C at the maximum heating
power, no special protective measures are required against the combustible construction
materials and components.
min.
50 mm
Figure 9
13
C.
0

Advertisement

loading
Need help?

Need help?

Do you have a question about the CALORA PREMIX and is the answer not in the manual?