2
ASSEMBLY
PREPARING SITE
To find the ideal location to set up this bike, ensure that:
• Area is well illuminated and well ventilated.
• Surface is level.
• There is enough space to access the unit and emergency dismount. If it is possible,
keep the following clearances: 0.5 m at each side and 2 m at the back.
• The bike is placed in an environment with a relative humidity range of 30-50%.
Please ensure the temperature is kept constant. Do not use in a moist or damp
environment as this may impact on the integrity and performance of the machine.
DIAGRAM
Handlebar Post
Spring Loaded Knob
Flywheel
Transport Wheel
Plastic Casing
Left Pedal
Front Stabilizer
Rubber Feet
Handlebar
Resistance Dial
Monitor
Saddle
Seat Post
Right Pedal
Rear Stabilizer
9
Need help?
Do you have a question about the IC 200 PRO and is the answer not in the manual?