DCS C-24 Installation Instructions Manual page 9

Professional wok cooktop
Table of Contents

Advertisement

Available languages

Available languages

CABINET PREPARATION
5. Establish the centerline of the wok cooktops desired location. It
should be the same as the center of the overhead ventilation
hood.
6. Cut the opening for the following installations:
Standard wok cooktop installations (See Fig.4).
I
Deep counter or island installations (See Fig.5).
I
NOTE: If the deck is used, the sides or bottom of the cutout may
be solid combustible or noncombustible material. If the bottom
is solid, provide 5" x 5" cutout in the left rear corner for the gas
inlet and power cord clearance.
If a solid side cabinet wall exists on one or both sides, you will
need to notch the front corner of the cabinet to match the
0
counter top notch and to allow clearance for the cooktop front
(See Fig.6).
0~2"
9-1/16"
3/8"
3/8"
Counter top backsplash
3/8"
24 -3/4"
23- 11/16"
24"
Fig. 4
3/4" min.
24"
22
Electrical and Gas
Supply.-(See Figs. 8,
9, 10, 11)
2 X 4 Corner Supports
Fig. 5
7
2
Wok Front projects
outward from cabinets
(Typical of standard depth cabinetry)
Wok Front
Flush with cabinets
(Minimum of 25-3/8" cabinet depth req'd)
Fig. 6
11/16"
-

Advertisement

Table of Contents
loading

Table of Contents

Save PDF