STEP 22:
Lift the center display onto the slots. Connect the network cable, power and ground.
STEP 23:
Run both network lines from the marquee to both games at the front. Go through the backside of
the podium. Stick tabs, clips, and wire wraps are provided to route the wires to the front podium.
25
Need help?
Do you have a question about the QUARTERBACK PRO and is the answer not in the manual?