84
COMPONENT/SYSTEM
Grease Fittings
Body Undercoating
Tailgate Seal Integrity
Packer/Ejector Cylinder Preventive
Maintenance
Packer/Ejector Panel Bolt-in
Cylinder Mount Bolts
PTO/Transmission Interface
Inspection
* Daily = 8 hrs. Weekly = 40 hrs. Monthly = 200 hrs. 6 Months = 1000 hrs. Yearly = 2000 hrs.
Issued July 2024
Maintenance and Adjustment
Maintenance and Adjustment
BODY PREVENTIVE MAINTENANCE CHART
*HOURS OF OPERATION
8
40
200
1000
2000
CHECK/SERVICE
to female pilot of PTO pump flange.
Failure to lubricate female pilot of PTO
as given may cause damage to the
pump shaft. Greasing is NOT required
on wet spline PTOs such as the
Chelsea 890/897 series.
Lubricate as shown on Body Lube
Chart.
Inspect body undercoating and repair
as necessary.
See Packer/Ejector Cylinder
Preventive Maintenance
Check for tightness. Bolt torques
should be 192 Ft-Lbs. (lubricated
threads)
Check the torque on the PTO mounting
screws and tighten to the proper torque
specification
.
87
Copyright 2024, The Heil Co.
Printed in the U.S.A.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HEIL DuraPack Python and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents

Save PDF