Installation Test
5-2
Installation Test
5-2-1
Preparation
5-2-2
Test procedure
Master station
MS
NS
WS
N NODE
RUN
TEST
X10
X1
SET
SW1
ON
1 2
3 4
Master station
MS
NS
WS
N NODE
SW2
RUN
TEST
X10
X1
SET
SW1
ON
1 2
3 4
This test is for adjusting the installation position (confirmation of receiving
wave, etc.) and the setup conditions (selection of unused frequencies, selec-
tion of transmission output, etc.) at installation. Both master and slave stations
require the switch operation.
• The DeviceNet master and DeviceNet slave do not need to be connected
for the installation test.
• Set the WNODE switch of the wireless master station to "00" and the
WNODE switch of a wireless slave station to "01" to "64", avoiding dupli-
cation.
• Since both the wireless master stations and wireless slave stations re-
quire the transmission power supply, connect them to the power supply
via the DeviceNet cable prepared for a micro-connector.
Master station
SW2
RUN
TEST
SET
Slave station
SW2
RUN
TEST
SET
Slave station
MS
NS
WS
SW2
N NODE
RUN
TEST
X10
X1
SW1
ON
1 2
3 4
Slave station
MS
NS
WS
N NODE
RUN
TEST
X10
X1
SET
SW1
ON
1 2
3 4
1. Set the mode select switch of the
W NODE
X10
X1
W CH
X10
X1
SW3
ON
1 2
3 4
5
6
7 8
2. Set the mode select switch of the
W NODE
X10
X1
W CH
X10
X1
SW3
ON
1 2
3 4
5
7 8
6
3. Turn on the communication power
SW2
SET
4. The LED display shows the receiv-
SW2
Section 5-2
wireless master station to "TEST",
and the WNODE switch to the WN-
ODE number of the wireless slave
station to be tested. "01" is used for
this example.
Set SW3 to "bit 4 = ON".
wireless slave station to "TEST".
supplies of the wireless master sta-
tion and all wireless slave stations.
The system is in test operation sta-
tus.
ing wave level "L1 to L9", if the wire-
less master station and the wireless
slave station to be tested have been
installed within the distance where
both stations can receive the electric
wave from each other.
73