Toshiba G9 Installation And Operation Manual page 53

Table of Contents

Advertisement

efesotomasyon.com -Toshiba inverter,drive,servo,plc
Figure 28. Startup Wizard Flow Chart.
A
(Nameplate Data)
F014
60.0
F017
On
F304
On/No OL
F402
On
F405
20
F406
26.4
F407
1750
F409
460
F426
60
F427
60
F441
150
F443
180
F990
0.5
F991
0.5
B
(Hoist)
F009
3.0
F010
1.5
F113
Increase
F114
F118
Unassigned
F130
Brake Fail
F132
Brake Release
F360
PG Feedback Option
F375
1024
F376
2
F377
On
F493
On
F494
Off
F511
1.5
F985
Closed-Loop Hoist
F986
2-Step Variable
C
(Traverse)
F009
6.0
F010
6.0
F015
Constant Torque
F113
Increase
F114
F118
Unassigned
F130
Fault All
F132
Always Off
F360
F493
Off
F494
Off
F986
2-Step Variable
ACE-tronics G9 ASD Installation and Operation Manual
Hz
HP
Amps.
RPM
Volts
Hz
Hz
%
%
Seconds
Seconds
Seconds
Seconds
N.O.
N.O.
N.O.
PG PPR
Phase No.
Detect
Express Stop
Plugging
Seconds
Volts
Seconds
Seconds
N.O.
N.C.
N.O.
Off
Express Stop
See
F986 on pg. 231
Plugging
descriptions of the associated discrete input terminals for a given
Volts
Speed Control mode selection.
for specifics on the setup and functional
43

Advertisement

Table of Contents
loading

Table of Contents