Step One - Ametek SurgeX Vertical+ Series User Manual

Switched ip controllable vertical pdu
Table of Contents

Advertisement

User Manual
2
1
3
4
V Series is designed to be installed vertically in the back of an equipment rack.

3.1 Step One

Assemble mounting brackets to the top and bottom of the PDU onto the PDU by connecting each mounting bracket
using 4 bolts each bracket utilizing the threaded holes (Diagram A).
Hint: The mounting brackets can be rotated in any direction to attach on the PDU Diagram B and C.
Diagram A
Diagram B
Diagram C
© 2023 AMETEK SurgeX | Technical Support 800-645-9721 | surgex.com
9

Advertisement

Table of Contents
loading

Table of Contents