Installing Termination Cap - Heat & Glo SUPREME-I25-IFT Installation Manual

Hide thumbs Also See for SUPREME-I25-IFT:
Table of Contents

Advertisement

G. Installing Termination Cap
WARNING
Fire Risk.
Maintain vent clearance to combustibles as
specified.
• DO NOT pack air space with insulation or other
materials.
Failure to keep insulation or other materials away
from vent pipe may cause overheating and fire.
CAUTION! Risk of Cuts/Abrasions/Flying Debris.
Wear protective gloves and safety glasses during instal-
lation. Sheet metal edges are sharp.
For installation of termination cap see minimum vent
heights for various pitched roofs. See Figure 5.8.
2 FT.
MIN.
GAS DIRECT VENT
TERMINATION CAP
Roof Pitch
H (Min.) Ft.
Flat to 6/12....................1.0*
Over 6/12 to 7/12 ........1.25*
Over 7/12 to 8/12 ..........1.5*
Over 8/12 to 9/12 ..........2.0*
Over 9/12 to 10/12 ........2.5*
Over 10/12 to 11/12 ..... 3.25
* H minimum may vary depending on regional snowfall.
Refer to local codes.
Figure 5.8 Minimum Height from Roof to Lowest Discharge
Opening
Heat & Glo • SUPREME-I25/30/35-IFT, SUPREME-I25/30/35-BIR, SUPRM-I30LP-IFT Installation Manual • 2532-980 Rev. AD • 3/24
HORIZONTAL
OVERHANG
20 INCHES MIN.
VERTICAL
WALL
LOWEST
DISCHARGE
OPENING
X
12
ROOF PITCH
IS X/ 12
H (MIN.) - MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OPENING
Roof Pitch
H (Min.) Ft.
Over 11/12 to 12/12 ....... 4.0
Over 12/12 to 14/12 ....... 5.0
Over 14/12 to 16/12 ....... 6.0
Over 16/12 to 18/12 ....... 7.0
Over 18/12 to 20/12 ....... 7.5
Over 20/12 to 21/12 ....... 8.0
27

Advertisement

Table of Contents
loading

Table of Contents