Installing Heat Shield And Horizontal Termination Cap - Heat & Glo 8000CF-OAK-IPI Owner's Manual

Installation and operation
Hide thumbs Also See for 8000CF-OAK-IPI:
Table of Contents

Advertisement

C. Installing Heat Shield and Horizontal Termination Cap
WARNING
Fire Hazard
Impaired performance of appliance
• Telescoping flue section of termination cap
MUST be used when connecting pipe section
to termination cap.
• Maintain a 1-1/2 inch minimum overlap on
telescoping fl ue section of termination cap.
WARNING
Fire Risk
Exhaust Fumes Risk
Impaired Performance of Appliance
• Overlap pipe slip sections at least 1-1/2 inches.
• Use pilot holes for screws.
• Screws must not exceed 1 inch long.
• Pipe may separate if not properly joined.
Heat Shield Requirements for Horizontal Termination
For all horizontally vented appliances, a heat shield MUST
be placed one inch above the top of the vent between the
wall shield fi restop and the base of the termination cap.
There are two sections of the heat shield. One section
is factory-attached to the wall shield fi restop. The other
section is factory-attached to the cap. See Figure 8.12.
If the wall thickness does not allow the required 1-1/2 inch
(38 mm) heat shield overlap when installed, an extended
heat shield (DVP-HSM-B) must be used.
Important Notice: Heat shields may not be fi eld constructed.
The extended heat shield (DVP-HSM-B) may need to
be cut to length. You will attach the cut heat shield to
the existing cap heat shield or wall shield fi restop heat
shield (refer to Figure 8.12) using the supplied screws.
You MUST maintain a 1-1/2 in. (38 mm) overlap of the
extended heat shield and the existing shields (both ends
of the heat shield). The small leg on the extended heat
shield should rest on the top of the vent (pipe section) to
properly space it from the pipe section.
Heat & Glo • 8000CF-OAK-IPI • 2059-900 Rev. o • 12/07
Installing the Horizontal Termination Cap
Vent termination must not be recessed in the wall. Siding
may be brought to the edge of the cap base.
Flash and seal as appropriate for siding material at outside
edges of cap.
When installing a horizontal termination cap, follow the cap
location guidelines as prescribed by current ANSI Z223.1
and CAN/CGA-B149 installation codes.
WARNING
Burn Risk
• Local codes may require installation of a cap
shield to prevent anything or anyone from
touching the hot cap.
NOTE: Where required, an exterior wall fl ashing is available.
When penetrating a brick wall, a brick extension kit is available
for framing the brick.
HEAT SHIELD OR
WALL SHIELD
FIRESTOP
CAN BE EXTENDED
INNER VENT
OUTER VENT
VENT DEPTH FROM BACK OF APPLIANCE TO
OUTSIDE SURFACE OF EXTERIOR WALL
(SEE CHART BELOW)
Figure 8.12
Venting through the Wall
Cap Specifi cation Chart
(depth without using additional pipe sections)
DVP-TRAPK1
DVP-TRAP1
Top Vent
Rear Vent
Depth
Depth
4-1/8 in. to
6 in.
8000
Series
DVP-HPC1
DVP-HPC1
Top Vent
Rear Vent
Depth
Depth
4-1/8 in. to
6-1/4 in.
DVP-TRAP1 can adjust 1-7/8 in. (4-3/16 to 6-1/16)
DVP-TRAP2 can adjust 4 in. (6-9/16 to 10-9/16)
DVP-HPC1 can adjust 2-1/8 in. (4-1/4 to 6-3/8)
DVP-HPC2 can adjust 4-1/8 in. (6-3/8 to 10-1/2)
HEAT SHIELD
EXTENDED
1-1/2 IN. (38 MM) MIN.
HEAT SHIELD
OVERLAP
SLIP SECTION
SHEATHING
INTERIOR
EXTERIOR
DVP-TRAPK2
DVP-TRAP2
Top Vent
Rear Vent
Depth
Depth
6-5/8 in. to
N/A
N/A
10-5/8 in.
DVP-HPC2
DVP-HPC2
Top Vent
Rear Vent
Depth
Depth
6-1/8 in. to
N/A
N/A
10-1/4 in.
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

8000cflp-oakipi

Table of Contents