Load Weighing Device

Installation

Move the car to the lowest level prior to installing the load cells. After the car is at the lowest
level, install the crosshead sensors according to manufacturer recommendations on top of the
crosshead beam.
The table below lists the wiring configuration of the Sensor to the Base board of the LWD.

Table 1: Wiring Configuration of the Sensor to the Base Board of the LWD

Sensor
Green
White
Black
Red
Page 2

Figure 2: Sensor

Figure 3: Base Board Connector

©2021 Smartrise Engineering, Inc. All Rights Reserved
LWD Base Board Connector
Pin 5
Pin 6
Pin 7
Pin 8
September 29,2021