Power Perform the following to connect power. See Set and verify the equipment matches the job specific parameters for proper operation. See the Hydro:Evolved sheet 7 for job specific information. • Connect main line power L1/L2/L3 to soft starter.
5. Connect UPH, UPL, DNH, and DNL from the solenoids to the Valve board. Motor/Soft Starter Perform the following to connect the soft starter to the motor. See the Hydro:Evolved sheet 8 for job specific information. See Appendix 2 for additional DIP switch settings.
Soft Starter Startup Manual Sprecher + Schuh Hydraulic Installation Construction All safety inputs are functional during Construction mode on the Hydro:Evolved controller. When these safety devices are installed, they are connected even if still on Construction mode. See page 5 for safety input connections. The following includes instructions for when none of these devices have been installed prior to beginning on Construction mode.
Soft Starter Startup Manual Sprecher + Schuh Hydraulic Installation 3. Verify the LCD on the Smartrise board and the soft starter power up. Figure 7: Breakers Final Setup Perform the following to set the Bypass Term Limit. Complete the checklist during the verification process.
Troubleshooting The following sections list troubleshooting procedures. Soft Starter Fault If the Smartrise controller indicates a soft starter fault and the soft starter has the fault LED flashing, see Appendix 1 Sprecher + Schuh Troubleshooting Chart. Wrong Direction If the motor is running in the wrong direction, swap any two motor leads.