Huawei LUNA2000-5-S0 User Manual page 83

Hide thumbs Also See for LUNA2000-5-S0:
Table of Contents

Advertisement

LUNA2000-(5-30)-S0
User Manual
Figure 5-7 Wall-mounted installation dimensions
Procedure
Step 1 Determine the positions for drilling holes using the marking-off template. Level
the positions of mounting holes using a level, and mark the positions with a
marker.
Step 2 Install the mounting kit.
When drilling holes, avoid the water pipes and power cables buried in the wall.
Issue 15 (2024-01-12)
D ANGER
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 System Installation
74

Advertisement

Table of Contents
loading

This manual is also suitable for:

Luna2000-30-s0

Table of Contents