Download Print this page

Preliminary Warnings - GiBiDi ART Instructions For Installation Manual

Electromechanical operator

Advertisement

UK
1 Sensitive frame.
2 Electronic equipment container.
3 Operators. ART5000: cable with 7 conductors of 1.5 mm².
ART5012, ART5024: cable with 5 conductors of 1.5 mm² for distances max.3m
from the control unit; for bigger distances cable of 2.5mm² (max.6m). In both
cases 3 conductors are used for the limit switch connection.
4 Push-button panel; cable with 5 conductors of 0.5 mm².
5 Key-selector; cable with 3 conductors of 0.5 mm².
6 Power supply line to equipment 220-230V 50-60Hz, cable with 3 conductors of
min. 1.5 mm² (follow regulations in force).
7 Flashing light; cable with 2 conductors of 1,5 mm².
8 Antenna.
9 Photocell transmitter; cable with 2 conductors of 0.5 mm².
10 Photocell receiver; cable with 4 conductors of 0.5 mm².
11 Electric lock.
WARNING: It is important that an omnipolar magneto-thermal switch with a
contact opening of minimum 3 mm is installed on the power supply line,
upstream of the equipment.
UK

PRELIMINARY WARNINGS

Check that the gate structure meets the standards laid down in the regulations in
force and that the gate movement is linear and without friction. It is recommended
to carry out any operations necessary before installing the operator and in
particular to always fit the mechanical end-stops.
OPERATOR INSTALLATION
Preliminary checks:
- Check that the gate structure is sufficiently robust. In any event, the operator
must push the gate at a reinforced point.
- Check that the gates move manually without effort for their entire travel.
- Check that the gate stops have been installed.
- If the gate is not a new installation, check the state of wear of all the components
and repair or replace the defective or worn parts.
The reliability and safety of the automated device is directly affected by the
state of the gate structure.
PRELIMINARY WARNINGS
3

Advertisement

loading

This manual is also suitable for:

500050125024