PRELIMINARY WARNINGS

Check that the gate structure is in conformity with the regulations in force and that the gate movement is linear without
friction.
Preliminary checks
• Check that the gate structure is sufficiently robust. In any case check that the gate weight and dimensions fall
within the operating limits of the operator.
Maximum leaf length:
2.5 m - maximum weight: 600 kg
3.5 m - maximum weight: 400 kg (it is recommended to use an electric lock).
• Check that the leaf can be moved manually without force (points of greatest friction) for the entire travel of the gate
during both opening and closing.
• Maximum cable length 10 m.
• Check that the area where the gearmotor will be fitted is not exposed to flooding.
• If the gate is not a new installation, check the state of wear of all the components, repair or replace the defective or
worn parts and perform any other operations necessary.
• Check that the mechanical end-stops have been fitted.
The reliability and safety of the automated device is directly dependent on the condition of the gate structure.
DESCRIPTION [ ] 5
À
Foundation box
Á
Motor unit
Â
Limit switch unit
Ã
Rod and output lever unit
Ä
Support lever and leaf release unit
Å
Cover

INSTALLATION

1)
Based on the type of structure and desired opening, decide on the exact position for the operator following the
type indications
.
2)
If not yet fitted, apply a closing and opening end-stop
3)
Dig a foundation hole in the appropriate position and large enough to fit the operator 7
4)
Provide for a water drain to prevent stagnation and subsequent oxidation in the foundation box 9
:
[ ]
4 .