Download Print this page

Siemens Inhab Energy Installation Manual page 7

Smart home energy monitor

Advertisement

Energy monitor connections
The energy monitor is the hub of the Siemens Inhab Energy. The screw terminalport
for the wiring harness is located on the left-hand side of the monitor. The screw
terminal ports across the top of the monitor are the inputs for the 50A Branch
Current Transformers (CTs) (the bundle may have come with 8 or 16 CTs, or none at
all). The A, B, and C screw terminal ports on the right side of the monitor are the
inputs for the 200A Main CTs (the bundle may have shipped with two or three). The
RJ45 LAN port and coaxial connector for the WiFi antenna cable are also on the
right hand side of the monitor. All of the ports are clearly labeled on the energy
monitor.
left
front
back
Wiring harness
7.6mm screw
terminal port
50A CT 3.8mm screw terminal ports
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
top
Inhab
TM
Energy | Model: INHEM100
3617 Parkway Ln, Peachtree Corners, GA 30092 | Made In India
IC: 28084-EMV3A
FCC ID:
Energy Monitor
2AS6P-EMV3A
Model: EMV3A
E535044
CAUTION / ATTENTION
Risk of electric shock
Review the installation guide.
Risque de choc electrique
Lisez le guide d'installation.
~100-240VAC L-N 1Ø/3Ø (Wye only)
50/60Hz, 0.041A, CAT III
M3 DIN rail mount
200A CT screw
5mm terminal
ports (A,B,C)
right
LAN port
LAN port
WiFi
connector
INHAB™ ENERGY INSTALLATION GUIDE
RJ45
RJ45
7

Advertisement

loading