Step 7(b): No empty breaker
and two Main CTs
Common in split phase homes
Secure the White (N) and Blue (L3) wires from the wire harness to the neutral bus bar.
Turn off two vertically adjacent (stacked) 15A single pole breakers and remove their
wires. Connect one of the breaker wires to the Black (L1) harness wire and a splicing
wire with a wire nut. Next, connect the second breaker wire to the Red (L2) harness
wire and a splicing wire with a wire nut. Then secure each of the extra wires to the two
breaker poles.
Hazardous Voltage
Will cause death or serious injury.
Turn off and lock out all power supplying this device before working on
this device. Replace all covers before power supplying this device is turned
on. In this case, aluminum wiring CANNOT be wire-nutted with copper
and the controller CANNOT be installed in such a manner, full stop.
INHAB™ ENERGY INSTALLATION GUIDE
22
A larger amp breaker may be used
if the gauge of the splicing wire
matches the existing gauge wire
from the breaker meeting the
national and regional codes
DANGER