Download Print this page

Siemens Inhab Energy Installation Manual page 23

Smart home energy monitor

Advertisement

Step 7(c): Three empty
breakers and three Main CTs
Common in 3-phase commercial systems
Secure the White (N) wire from the wire harness to the neutral bus bar. Turn off
three vertically adjacent (stacked) single pole breakers and secure the Black (L1),
Red (L2), and Blue (L3) wires from the harness to each of the hot leads from each
breaker.
Hazardous Voltage
Will cause death or serious injury.
Turn off and lock out all power supplying this device before working on
this device. Replace all covers before power supplying this device is
turned on.
Any empty breaker size can be
used in this scenario (not limited
to 15A)
DANGER
INHAB™ ENERGY INSTALLATION GUIDE
23

Advertisement

loading