Download Print this page

Siemens Inhab Energy Installation Manual page 16

Smart home energy monitor

Advertisement

Step 5(b): Breaker-fed solar
Main CT installation
Open the clasps on the CTs and place each clamp around one of the main service
cables between the meter and the main breaker. Then, shut the clasps to secure the
CTs. IMPORTANT! The Breaker W imprint on the bottom of the CTs should point
toward the breakers. Finally, insert the screw terminal plugs into the ports on the
right side of the monitor. To avoid clutter, unscrew the 22 AWG wires from the screw
terminals, cut them to size, and reattach them ensuring the black and white wires
match the icons on the front of the Inhab Energy.
Meter
Hazardous Voltage
Will cause death or serious injury.
Turn off and lock out all power supplying this device before working on
this device. Replace all covers before power supplying this device is
turned on.
INHAB™ ENERGY INSTALLATION GUIDE
16
front of the Inhab Energy
Breakers
DANGER
Solar Panels
Inverter

Advertisement

loading