Step 7(d): No empty breaker
and three Main CTs
Common in 3-phase commercial systems
Secure the White (N) wire from the wire harness to the neutral bus bar. Turn off
three vertically adjacent (stacked) 15A single pole breakers and remove their wires.
Connect one of the breaker wires to the Black (L1) harness wire and a splicing wire
with a wire nut. Next, connect the second breaker wire to the Red (L2) harness wire
and a splicing wire with a wire nut. Next, connect the third breaker wire to the Blue
(L3) harness wire and a splicing wire with a wire nut. Then secure each of the
splicing wires to the three breaker poles.
Hazardous Voltage
Will cause death or serious injury.
Turn off and lock out all power supplying this device before working on
this device. Replace all covers before power supplying this device is
turned on.
INHAB™ ENERGY INSTALLATION GUIDE
24
A larger amp breaker may be used
if the gauge of the splicing wire
matches the existing gauge wire
from the breaker meeting the
national and regional codes
DANGER