Download Print this page

Siemens Inhab Energy Installation Manual page 27

Smart home energy monitor

Advertisement

Step 8 (continued):
A note about solar monitoring
For the Inhab Energy to be able to calculate how much energy from the system is
going to and from the grid, Branch CTs will need to be connected to the incoming
leads from the inverter regardless of whether the solar is a breaker-fed or a line-side
tap installation. Specify the circuits monitored by these CTs as ' Solar/Generation' in
the app. If only one CT is used, input a circuit multiplier in the app to double or
triple the reading by entering a "2" or "3".
Hazardous Voltage
Will cause death or serious injury.
Turn off and lock out all power supplying this device before working on
this device. Replace all covers before power supplying this device is
turned on.
DANGER
INHAB™ ENERGY INSTALLATION GUIDE
Solar Panels
Inverter
27

Advertisement

loading