Assembling The Boiler - Beretta POWER EVO-X Series Installation Manual

Condensing high power boiler
Table of Contents

Advertisement

2.8 Assembling the boiler

b
The POWER EVO-X thermal modules are supplied with a
bracket for wall-mounting.
b
Check that the wall on which the appliance is to be installed
is sufficiently solid and guarantees the safe anchorage of the
screws.
For the assembly, proceed as follows:
ƒ position the boiler support plate (F) on the wall and use a spirit
level to make sure it is perfectly horizontal
ƒ mark the position of the holes (ø 6 mm) for securing the boiler
support plate (F)
ƒ make sure all the measurements are exact, then drill the holes
using drill tips with the diameters indicated above
ƒ fasten the plate to the wall.
POWER EVO-X 50 DEP - 50
POWER EVO-X 65 - 80
To ensure the boiler is firmly fastened to the wall, replace the
screws on the back of the boiler with the longer ones contained in
the bag supplied with the appliance.
POWER EVO-X 65 - 80
F
b
Before making the hydraulic connections, the protection
plugs must be removed from the delivery, return and conden-
sate drain piping.
F
 
The dimensions and positioning of the thermal module water fit-
tings are shown in the table below.
MI
MI
POWER EVO-X 50 DEP - 50
POWER EVO-X 50 DEP - 50
MI
SC
POWER EVO-X 65 - 80
POWER EVO-X 65 - 80
G
MI
DESCRIPTION
50 DEP
MI (system delivery)
G 1" 1/2 M G 1" 1/2 M G 1" 1/2 M G 1" 1/2 M
RI (system return)
G 1" 1/2 M G 1" 1/2 M G 1" 1/2 M G 1" 1/2 M
SC (condensate
discharge)
G (gas inlet)
G 3/4" M
diverter valve connection G 1" 1/2 M G 1" 1/2 M
23
RI
RI
diverting valve
connection
G
RI
SC
RI
POWER EVO-X
50
65
25
25
25
G 3/4" M
G 3/4" M
G 3/4" M
-
80
Ø
Ø
25
Ø mm
Ø
-
Ø

Advertisement

Table of Contents
loading

Table of Contents