Structure - Beretta POWER EVO-X Series Installation Manual

Condensing high power boiler
Table of Contents

Advertisement

Structure

1.3
POWER EVO-X 50 DEP - 50
POWER EVO-X 65 - 80
Gas valve
1
Degassing unit/boiler discharge tap
2
Differential heating pressure switch
3
Pressure transducer with minimum pressure
4
function
NTC delivery probe
5
6
Safety thermostat with manual reset by means of
a board reset
Suction line
7
Heat exchanger
8
Detection electrode
9
10 Burner
Flue gas analysis outlet
11
12 Flue gas exhaust
13 Flue gas probe
14 Ignition electrode
15 Air vent valve
16 Check valve
17 NTC return line probe
18 Pressure gauge
19 Mixer
20 Fan
21 Circulator
22 Drain-trap
23 Power supply connector
16 Check valve
6
Gas valve
1
Degassing unit/boiler
2
discharge tap
Pressure transducer with
3
minimum pressure function
4
Heating pressure switch
Pressure gauge
5
Heat exchanger
6
Detection electrode
7
NTC delivery probe
8
Safety thermostat with
9
manual reset by means of a
board reset
10 Air vent valve
Flue gas exhaust
11
12 Flue gas analysis outlet
13 Flue gas probe
14 Burner
15 Ignition electrode
16 Check valve
17 Mixer
18 Fan
19 Power supply wiring
20 Atmospheric silicon tube
21 NTC return line probe
22 Circulator
23 Drain-trap

Advertisement

Table of Contents
loading

Table of Contents