Filling The Heating System And Eliminating Air; Emptying The Heating System - Beretta POWER EVO-X Series Installation Manual

Condensing high power boiler
Table of Contents

Advertisement

2.14 Filling the heating system and eliminating air

In the case of a new installation or replacement of the boiler, it is
necessary to clean the heating system beforehand. To ensure the
device works well, after every cleaning intervention remember to
top up the additives and/or chemical treatments (e.g. anti-freeze
liquids, filming agents, etc.) and check the parameters are within
the values indicated in the tables.
PARAMETERS
UM
pH value
Hardness
°F
Appearance
Fe
mg/kg
Cu
mg/kg
For the POWER EVO-X boiler, there must be a system filling line,
preferably connected to the return line.
Before emptying or filling the system, disconnect the appliance
from the electricity supply. For changes of direction, use a T-shaped
fitting with an inspection plug that allows the piping to be easily
cleaned periodically.
Always make sure that after cleaning the inspection plugs are her-
metically sealed with the relative gasket.
ƒ Before filling the system, make sure the air outlet plug of the
venting valve in the boiler is open (loosened)
ƒ Use the pressure gauge to check the pressure reaches the val-
ue envisaged for the system (1.5-2.0 bar)
ƒ Reconnecting the electricity supply; the boiler will run the auto-
matic venting cycle
NOTA: every time the boiler is electrically powered, the automatic
venting cycle is run (it lasts 6 min) .
NOTE: if there is a water alarm (E040, E041 or E042), the venting
cycle cannot be carried out.
ƒ If the system pressure is lower than 1 bar following the
venting cycle, fill the system again.
HEATING CIRCUIT
FILLING
WATER
WATER
7–8
-
-
<0.5
<0.1
+
+
RESET
MENU
1
1

2.15 Emptying the heating system

Before draining, set the boiler to OFF and shut off the electrical
supply setting the main system switch to OFF.
ƒ Close the heating system taps (if present).
ƒ Connect a pipe to the system degassing/discharge tap (C), then
manually loosen the valve to let the water flow out.
ƒ After completing the operations, remove the pipe from the sys-
tem degassing/discharge tap (C) and close the valve.
-
< 15
clear
-
-
C
C
35
POWER EVO-X 50 DEP - 50
POWER EVO-X 65 - 80

Advertisement

Table of Contents
loading

Table of Contents