3.9 Final checks
Once all components have been installed, the following checks should be carried out:
•
All screws tightening applied during the installation process.
•
Correct operation of the throttle.
•
Pipe connections and no fluid leaks.
•
All the electric connections safely wired.
•
Correct ignition of the engine by the electric start
•
Correct operation of engine instruments (terminal display).
•
Engine stop by start/stop switch.
Upon completion of the work, a ground test and then additional flight approval is required to
ensure proper operation of the system. For each new model aircraft, a series of test must be
performed and documented in appropriate reports after the initial engine installation. The
company Vittorazi strongly recommends sending those reports that contain operating data
(RPM, temperatures, consumption, etc) for validation.
Moster 185 EFI - Installation manual – V1/2024
51