3.12 Final checks

Once all components have been installed, the following checks should be carried out:
All screws tightening applied during the installation process.
The fluids (transmission oil, coolant) are already inserted and at the right level.
Correct operation of the throttle and the choke system.
Pipe connections and no fluid leaks.
All the electric connections safely wired.
Correct ignition of the engine by the electric start or by the manual starter.
Correct operation of engine instruments (tachometer, temperature sensors).
Engine stop by killing switch.
Upon completion of the work, a ground test and then additional flight approval is required to
ensure proper operation of the system. For each new model aircraft, a series of test must be
performed and documented in appropriate reports after the initial engine installation. The
company Vittorazi strongly recommends sending those reports that contain operating data
(RPM, temperatures, consumption, etc) for validation.