Berbel Skyline Edge Base Operating And Installation Instructions page 107

Island hood
Hide thumbs Also See for Skyline Edge Base:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 98
Installation
=
a Gap between two bolt anchors
b Gap between two bolt anchors
c Diameter of circle over slots
1 Determine the hanging position. Observe the hob
position:
2 The ceiling mounting plate's centre point is directly
above the hob's centre point.
2 The ceiling mounting plate runs parallel to the hob.
1 Make sure that the legal safety clearances will be
complied with:
2 With gas hobs, at least 650 mm.
2 Recommendation with electric hobs 650 mm.
- Observe the specifications for the cooking appliances
(e.g. installation above a solid fuel stove).
6006890_0 – 21.11.2023
a
=
801 mm
1011 mm
300 mm
300 mm
855 mm
1055 mm
. WARNING!
Risk of death due to explosions or electric shock!
Drilling through gas, water or electrical lines can lead to
hazardous situations.
1 Ensure that there are no lines in the ceiling at the
fastening points.
Ø 8
1 Determine the locations of the fastening points and mark
them:
2 2 bolt anchors inside the lock holes.
2 2 bolt anchors in the centre of slots.
1 Drill the holes in the ceiling.
6
1 Insert the bolt anchors into the holes.
1 Ensure that the bolt anchors are tight in the holes.
1 Check the position of the lock holes and the slotted holes
on the ceiling mounting plate.
1 Remove the nuts and washers from the bolt anchors at
the position of the slotted holes.
1 Ensure that there is at least a 6 mm gap between the
ceiling and the top edge of the washers.
65
107

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bih 100 skebBih 120 skeb

Table of Contents